NEW COVENANT OF JESUS CHRIST CHILDREN’S HOME AND REHABILITATION CENTRE.
P.O BOX 1102-50200,
BUNGOMA –
KENYA
EAST AFRICA
Email: - ncojministries@gmail.com
THE PROPOSED PROPOSAL FOR THE CHILDREN CENTRE AND A REHABILITATING CENTRE.
The proposed Children Centre and the rehabilitating Centre were reached because of a statistical overview being carried out about orphans, the needy, the youth, Children, the old, men and women for requiring having a change in character.
Society needs to correct the bad norms of drunkenness, bhang smoking, sex abuse and mistrust in God but instead fall victim to traditional beliefs.
The New Covenant of Jesus Christ Ministries is out to oversee its orphans, the needy and the misplaced mind within the harsh environment to empower and assist in achieving our goal of raising boys and girls, men, and women to turn to a God's limelight. For this point, a Centre is required to be established for proper and correct going.
The following proposal outlines what is required. At this Centre, we have 37 orphans grouped according to their education status which includes:
Primary Schooling. Secondary Schooling Colleges / Universities.
a) Under Primary Schooling we have 24 pupils, most being day scholars who stay with the bishop as their guardian. Through God’s guidance all can be fine and through Him you never know, your advice could be the only key they have been waiting for to open their future. One child requires $51 (Dollars) per month ie.1.2 dollars per day to keep going. Another especially important factor is their education which requires $1262. (Dollars) per year, for 24 pupils.
b} The Secondary Schooling status has 7 students, who require $413 (dollars) in general for their tuition and requirement per year. c) The college /University status has 4 students. Their schooling demands $ 515 (dollars per semester. To complete the 8 full semesters each student requires $ 4124 (dollars) (Rating to Kenya Shilling is 97/=). The Grand Total for the Educational cost per year is $ 5799
THE CHILDREN HOME AND REHABILITATION CENTRE.
The Children's home and the rehabilitation Centre focus on the nature of environments, community, and the world, to those who are affected in concerned areas. The Children's home and the rehabilitation Centre has 3 acres of land bought by the ministry to establish the Centre. The general Centre shall have different structures that will require equipping them namely as follows.
Administration block-
This shall occupy all administrative structures for both children’s homes and rehabilitation Centers. This is estimated to cost $ 10309 (dollars). When completed, the hall for the converging for seminars, conferences, and other communal activities. It’s estimated to cost $25773 (dollars) when completed. The kitchen is attached to the store and the dining hall, for all effective food preparation, storage and meal receiving.
The entire construction shall cost $ 30928 to be completed.
A visitor house to accommodate 12 beds is estimated to cost $30928. General compounds latrine / Toilet bathrooms, piping that is the sewage system.
The entire construction shall cost $ 25773 to complete. Construction of 2 spacious cubical dormitories for boys and Girls that will cost $ 51547.Drilling of water, piping and setting up of tanks in general.
This shall cost $20619 (dollars). Buying of a bus (52, seaters) for the Centre's transportation for both Children and the entire Centre members.
The bus is estimated to cost $ 61856.
The ICT room shall cover all the computer learning Systems, the Tailoring room, the saloon and the guiding and counselling room. This will cost $51547. This is part of the rehabilitation System within the Centre for the Community.
The Security System covers the entire Centre, starting from the main compound to the whole security system. The entire System is estimated to cost $ 5155 (dollars). The installation of the electricity at the entire which shall cost $154639.
In the Centre other requirements are also essential for the proper running of the Centre. These include medical, meals, workers and any emergencies that will require funds.
In general, the whole section shall cost $5155 every month.
The total for the proposed proposal is $ 443301. As the Centre grows, the construction continues, and with time several other activities can emerge that will require much more updates and Consultations.
Thank you.
Faithfully Yours,
BISHOP: WILBERFOCE MUHINDI